Rohini Sector-29, New Delhi

Reviews

Be the first to write a review of Rohini Sector-29 and become a Locality expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Rohini Sector-29
Cons:
Enter some negative aspects of Rohini Sector-29

News

DMRC to study double-decker metro corridor to Rohini Sector 34

Indiatimes · · Infrastructure

Delhi Metro Rail Corporation will conduct a feasibility study for a 16.3-km integrated double-decker flyover-cum-metro corridor from Keshav Puram to Rohini Sector 34.

Key facts

DMRC will carry out a feasibility study for an integrated double-decker flyover-cum-metro corridor along the proposed Keshav Puram-Rohini Sector 34 corridor, part of Phase-V(B) expansion. The 16.3-km corridor is one of seven proposed expansions awaiting final approval. If feasible, it will be the city's fourth double-decker flyover, with three currently under construction. On a double-decker viaduct, vehicles run on the lower deck while metro runs on the upper deck.

A tender has been floated for a consultancy service to conduct the study. Estimated cost: Rs 2 crore, expected completion: six months.

The proposed corridor will be fully elevated with 12 stations connecting West Shalimar Bagh, East Pitampura, Rohini Sector 16, Delhi Technological University and Rohini Sector 29. Three stations will have interchange facilities: Keshavpuram (Red Line), North Pitampura (Pink Line) and Rohini Sector 34 (Red Line).

Existing double-decker viaducts under construction:

  • Bhajanpura-Yamuna Vihar (Pink Line): 1.4 km, expected operational by year-end
  • Azadpur-Ashok Vihar (Magenta Line extension): 2.2 km, expected ready by year-end
  • Sangam Vihar-Ambedkar Nagar (Golden Line): 2.4 km, longest of the three

Other DMRC Phase-IV projects under construction: Krishna Park Extension to Deepali Chowk, Inderlok to Indraprastha (Magenta Line extensions), Delhi Aerocity to Tughlaqabad and Saket G Block to Lajpat Nagar (Golden Line), Rithala-Kundli (Red Line extension).

News items are reports published elsewhere, condensed; follow the link for the full report. PropertyWala.com is not their source.

Price Trends

Locality ID
A771113329