Pithampur, Dhar

Property Types
Independent Houses

Reviews

Be the first to write a review of Pithampur and become a Locality expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Pithampur
Cons:
Enter some negative aspects of Pithampur

News

Pithampur-Dhar Rail Section Track Testing Completed

The Free Press Journal · · Infrastructure

Track testing completed on 38.26-km Pithampur-Dhar section of Indore-Dahod rail line; electrification and station construction underway.

Key facts

Indore-Dahod new rail line project: track testing successfully conducted on 38.26-km section between Pithampur and Dhar. Engine trial using tower wagon covered distance in 54 minutes at maximum speed of 50 kmph. Electrification and signalling works progressing rapidly. Station construction underway at Pithampur, Sagour, Gunawad and Dhar, including station buildings, platforms, circulating areas and covered sheds. When completed, rail line will strengthen regional connectivity, boost industrial and economic activity, and improve transport facilities.

Indore–Dahod Rail Line Track Testing Begins at Pithampur–Dhar

The Free Press Journal · · Infrastructure

The Indore–Dahod new rail line project conducted three days of track testing on the Pithampur–Dhar section starting March 23, 2026.

Key facts

The Indore–Dahod new line project achieved a milestone with track testing on the Pithampur–Dhar section from March 23 to 26, 2026. Work from Indore to Tihi is complete; construction between Tihi and Dhar is proceeding. Tunnel construction remains pending in the Tihi–Pithampur section. A track tamping machine was transported by road and placed on the railway track to complete tamping and repair work between Pithampur and Dhar. A tower wagon was also transported by road and placed near Pithampur to test track stability and safety by operating it up to the prescribed speed limit. Chief Engineer (Construction) Dheeraj Kumar from Mumbai supervised the testing and conducted detailed inspection of the track from Pithampur to Dhar. This is the first instance of the track's capacity being tested by tower wagon operation on the Indore–Dahod new rail line. Parallel tunnel construction will continue at rapid pace. The railway administration is working towards early commencement of the line up to Dhar.

Madhya Pradesh CM urges Pithampur residents to challenge carbide waste disposal in court

The Hindu · · Regulatory

Madhya Pradesh High Court granted six weeks for waste disposal of Union Carbide factory material at Pithampur in Dhar district, with Chief Minister urging local residents to present their concerns in court.

Key facts

Madhya Pradesh Chief Minister Mohan Yadav said people of Pithampur in Dhar district should approach court to present their side on Union Carbide waste disposal. Madhya Pradesh High Court granted six weeks to state government to act on waste disposal per safety guidelines. The HC also directed media not to give incorrect news on the waste disposal issue. Waste packed in 12 sealed containers was shifted January 2 from Union Carbide factory in Bhopal to disposal site at Pithampur in Dhar district, located 250 km away. The incineration is to be carried out by Ramky Enviro company. Protests occurred in Pithampur on January 3 after waste arrived; two men attempted self-immolation during protest. Protesters claim disposal would harm humans and environment. On December 3, 2024, HC asked government to remove and transport waste within four weeks and warned of contempt proceedings if directive was not acted upon. The December 2-3, 1984 methyl isocyanate gas leak from Union Carbide pesticide factory in Bhopal killed at least 5,479 persons and left thousands with serious injuries and health issues.

News items are reports published elsewhere, condensed; follow the link for the full report. PropertyWala.com is not their source.

Price Trends

Also known as: Pithhampur
Locality ID
A811074204
PinCode
454775