Paradigm Zenith - Thane West, Thane

Builder
Paradigm Group
Construction
Under Construction
Completion
Dec, 2025
Properties
Apartments
RERA
P51700008949

Description

Plenty of homes with proper ventilation

Pradigm Zenith by Pradigm Realty located at Thane West, Thane introduces the ultra-modem & spacious 1 & 2 BHK Homes with the carpet area 497 - 740 sq.ft. having world-class amenities. The project is equipped with key amenities including fire safety systems, gymnasium, clubhouse, car parking etc. & well connected with other parts of city and has all the basic utilities nearby.

Amenities:

  • Gymnasium
  • Swimming pool
  • Clubhouse
  • Jogging Track
  • Children’s Play Area
  • Indoor Games
  • Security Personal
  • Car Parking
  • Party Area
  • Rainwater Harvesting
Paradigm Realty is an organization spearheaded with credible experience of delivering cutting edge Real-Estate to the city of Mumbai by employing global contemporary techniques, which ensure quality standards and timely delivery of their product. The synthesis at Paradigm is to deliver comfort homes catering to practical needs of end-user including cross ventilation, minimal floor-space wastage yet matchless aesthetics, dedicated functional areas & tailored budgets. The group’s focus areas are Western Suburbs of Mumbai including Santacruz (W), Khar (W), Borivali, etc.

Highlights

  • Fire Alarm
  • Park Facing
  • Reserved Parking
  • Park
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • Lifts

Configurations

Type Area Possession Price *
2BHK Apartment740 SqFeetImmediate/Ready to move₹ 40 - 60 lacs
* Data has been collected from publicly available sources and may not be up to date.

RERA

P51700008949 PUSHPANJALI RESIDENCY PHASE III Lapsed 66% built

Confirmed with MahaRERA on 21 Sep 2026. Registered as "PUSHPANJALI RESIDENCY PHASE III".

Promoter
Shriraam Pioneer Developers Private Limited
Registered on
19 Aug 2017
Proposed completion
Dec 2025 (originally Dec 2022)
Project type
Others
Planning authority
Others
Address as filed
Ghodbunder Road, Owale, Thane (M Corp.), Thane, Thane, 400615
Land area
27,738 sq m (298,584 sq ft)
Sanctioned built-up area
26,936 sq m (289,950 sq ft)
Buildings
S1 (32 floors) - 1 of 128 available; S2 (32 floors) - 3 of 127 available; S3 (32 floors) - 0 of 131 available; S4 (31 floors) - 3 of 143 available; BUNGALOW 41 (2 floors) - 0 of 1 available; BUNGALOW 42 (2 floors) - 0 of 1 available; BUNGALOW 43 (2 floors) - 0 of 1 available; BUNGALOW 44 (2 floors) - 0 of 1 available; BUNGALOW 45 (2 floors) - 0 of 1 available; BUNGALOW 46 (2 floors) - 0 of 1 available; BUNGALOW 47 (2 floors) - 0 of 1 available; BUNGALOW 48 (2 floors) - 0 of 1 available; BUNGALOW 49 (2 floors) - 0 of 1 available; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA; NA
Parking
Open Space 95, Closed/Covered 398
Complaints on the portal
13
BuildingUnit typeCarpet areaUnits
S11 BHK TYPE 1 37 sq m (395 sq ft) 30
S11 BHK TYPE 2 36 sq m (383 sq ft) 8
S12 BHK TYPE 3 50 sq m (533 sq ft) 30
S12 BHK TYPE 2 59 sq m (638 sq ft) 30
S12 BHK TYPE 1 45 sq m (489 sq ft) 30
S21 BHK TYPE 3 39 sq m (420 sq ft) 25
S21 BHK TYPE 2 38 sq m (407 sq ft) 23
S21 BHK TYPE 1 38 sq m (406 sq ft) 28
S21 BHK TYPE 5 36 sq m (388 sq ft) 28
S21 BHK TYPE 4 35 sq m (372 sq ft) 23
S32 BHK TYPE 3 56 sq m (608 sq ft) 24
S32 BHK TYPE 2 51 sq m (544 sq ft) 19
S32 BHK TYPE 1 49 sq m (525 sq ft) 17
S31 BHK TYPE 3 38 sq m (414 sq ft) 10
S31 BHK TYPE 1 38 sq m (404 sq ft) 51
S31 BHK TYPE 2 37 sq m (396 sq ft) 10
S42 BHK TYPE 2 51 sq m (544 sq ft) 20
S42 BHK TYPE 1 49 sq m (525 sq ft) 19
S41 BHK TYPE 3 38 sq m (414 sq ft) 9
S41 BHK TYPE 1 38 sq m (404 sq ft) 60
S41 BHK TYPE 2 37 sq m (396 sq ft) 9
S42 BHK TYPE 3 56 sq m (608 sq ft) 25
BUNGALOW 41B1 84 sq m (901 sq ft) 1
BUNGALOW 42B2 102 sq m (1,100 sq ft) 1
BUNGALOW 43B3 102 sq m (1,100 sq ft) 1
BUNGALOW 44B4 85 sq m (916 sq ft) 1
BUNGALOW 45B5 117 sq m (1,256 sq ft) 1
BUNGALOW 46B6 209 sq m (2,252 sq ft) 1
BUNGALOW 47B7 209 sq m (2,252 sq ft) 1
BUNGALOW 48B8 209 sq m (2,252 sq ft) 1
BUNGALOW 49B9 209 sq m (2,252 sq ft) 1
Quarterly returnFiledBuiltUnits booked
Q2 FY 2024-2025 not filed - in default - -
Q3 FY 2024-2025 not filed - in default - -
Q4 FY 2024-2025 not filed - in default - -
Q1 FY 2025-2026 not filed - in default - -
Q2 FY 2025-2026 not filed - in default - -
Q3 FY 2025-2026 not filed - in default - -
Construction progress as reported to the portal

S1

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 3%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

S2

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 100%
  • Slabs of Super Structure: 30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 3%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

S3

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

S4

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

BUNGALOW 41

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 42

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 43

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 44

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 45

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 46

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 47

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 48

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

BUNGALOW 49

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 50%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 55%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

NA

  • Excavation: 0%
  • Basement (if any): 0%
  • Podiums (if any): 0%
  • Plinth: 0%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 0%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - WILL BE DONE PRIOR TO OC
  • Water Supply: 0% - WILL BE DONE PRIOR TO OC
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - WILL BE DONE PRIOR TO OC
  • Storm Water Drains: 0% - WILL BE DONE PRIOR TO OC
  • Landscaping & Tree Planting: 0% - WILL BE DONE PRIOR TO OC
  • Street Lighting: 0% - WILL BE DONE PRIOR TO OC
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - WILL BE DONE PRIOR TO OC
  • Solid Waste Management And Disposal: 0% - WILL BE DONE PRIOR TO OC
  • Water conservation /Rain water harvesting: 0% - WILL BE DONE PRIOR TO OC
  • Energy managemcnt: 0% - WILL BE DONE PRIOR TO OC
  • Fire protection and fire safety requirements: 0% - WILL BE DONE PRIOR TO OC
  • Electrical meter room, sub-station, receiving station: 0% - WILL BE DONE PRIOR TO OC
  • Aggregate area of recreational Open Space: 0% - WILL BE DONE PRIOR TO OC
  • Open Parking: 95% - WILL BE DONE PRIOR TO OC
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Paradigm Zenith and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Paradigm Zenith
Cons:
Enter some negative aspects of Paradigm Zenith

Location

Paradigm Zenith, Ghodbunder Road, Thane West, Thane - 401208 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Hindustan Petroleum (<1 km)
    • Azad Nagar Bus Stop (~6 km)
    • ST Bus Stand - Khopat (~11 km)
    • Thane (~14 km)
    • Chhatrapati Shivaji Maharaj International Airport (~31 km)
    • Navi Mumbai International Airport (~46 km)
  • Shopping & Dining

    • Mini Punjab (<1 km)
    • Big Centre (<1 km)
    • Panchvati Sweets (~1 km)
    • A-Rey Cafe (~1 km)
    • Dmart (~2 km)
    • Amrapali Arcade (~8 km)
  • Healthcare

    • Bhaskar EyeCare (<1 km)
    • Tieten Medicity (<1 km)
    • Shiv Drushti Eye & Dental Hospital Clinic (<1 km)
    • Dr. Darandale (~1 km)
    • Generic Medicine Store (~2 km)
    • Genericart Medicine Store (~2 km)
  • Education

    • Seven Square Academy (<1 km)
    • AP shah Institute of Technology (~1 km)
    • Euroschool Thane (~2 km)
    • Shubham Raje (~5 km)
    • The Indian Library (~10 km)
    • Indian Institute of Technology Bombay (~23 km)
  • Leisure & Entertainment

    • TMC Traffic Park (~2 km)
    • Racquet Club (~4 km)
    • Dr Kashinath Ghanekar Drama theatre (~7 km)
    • Inox (~11 km)
    • Dadoji Konddev Stadium (~13 km)
    • Tiger & Lion Safari (~14 km)
  • Services

    • AU Small Finance Bank (<1 km)
    • Axis Bank (~1 km)
    • DHL (~6 km)
    • Rustomjee Fire Station (~11 km)
    • Thane Municipal Corporation (~12 km)
    • Naupada Police Station (~13 km)
  • Religious Places

    • Shree Jagnath Mahadev Temple (~4 km)
  • Business & Hospitality

    • Colour Chem (~9 km)
    • Raymond Mills (~10 km)
    • ibis Thane (~10 km)
    • IBIS (~10 km)
    • Ashar IT Park (~11 km)
    • Reliance Corporate Park (~24 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J721190095
Updated
Searches
2168
Views
845