Musakheri, Indore

Reviews

Be the first to write a review of Musakheri and become a Locality expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Musakheri
Cons:
Enter some negative aspects of Musakheri

News

Indore to Open Six Master Plan Roads by Dussehra

Patrika · · Infrastructure

Indore plans to open six master plan roads by Dussehra, while 1,275 obstructing homes and shops have been identified for removal on six other roads.

Key facts

Indore has 23 master plan roads; work is underway on 17. Six are due to open by Dussehra, and work on the remaining six will start after the rains. Authorities identified 1,275 obstructing homes and shops for removal. The six scheduled roads are Madhumilan–Chhawni–Jagannath Dharmshala; Laxmibai statue–Jinsi; Jinsi–Neminath temple; Sanwer Road petrol pump–Shiv Shakti Nagar Hanuman temple; Musakhedi crossing–Sanwariya Dham service road; and the Janjeerwala crossing–past Laxmi Memorial Hospital bridge section of the Veer Savarkar statue–Nehru Nagar Road No. 9–Atal Gate/MIG police station road.

Other listed stretches include Jinsi crossing–Subhash Marg–Rambagh bridge (80 feet wide, 1.75 km; over 200 obstructions); Subhash Marg–Kadillpura–Indore Wire Factory (80 feet, 0.5 km; over 150); AB Road GPO crossing–Sarwate bus stand/Shraddhanand Marg (80 feet, 1.3 km; over 250); and the Airport Road–MR-5 link (100 feet, 2.4 km; over 300). Two further stretches are listed as 60 feet wide and 2 km with 250 obstructions, and 60 feet wide and 1 km with 125.

Officials set 30–90-day deadlines and directed penalties or termination notices for slow work. PD Agrawal Construction received a termination notice after a ₹10 lakh penalty; Victory One and SK Infrastructure were each fined ₹5 lakh, and Highway Infrastructure ₹10 lakh.

News items from other publishers are their reports, condensed; follow the link for the full report. PropertyWala.com is not their source.

Price Trends

Locality ID
A781113814