Elevation
Swimming Pool
Master Plan
 7

Marvel Piazza - Viman Nagar, Pune

Builder
Marvel Group
Construction
Completed
Completion
Dec, 2022
Properties
Apartments
RERA
P52100003653

Description

Safe haven for families

Marvel Piazza is one of the residential developments by Marvel Groups located in Pune. The project offers 2, 3 and 4 Bhk apartments and penthouses ranging between 1385 to 2361 sq.ft. which is spread over in the total area of 5.33 acres. at very competitive and affordable price. It is well planned and is built with all modern amenities.

Amenities

  • Park
  • Security
  • Power Backup
  • Water Supply
Marvel Realtors is one of the reputed names from Pune's real estate sector. Having a decade over experience, they promises world class services with finest infrastructure along with state of the art lifestyle.

Highlights

  • Power Back-up
  • Visitor Parking
  • Maintenance Staff
  • Water Supply / Storage
  • Rain Water Harvesting
  • Waste Disposal
  • RO System
  • Water Softner
  • Centrally Air Conditioned
  • Lifts
  • High Speed Internet
  • Wi-Fi
  • RO System
  • Balcony
  • Basement
  • Reserved Parking
  • Security Guards
  • Fire Alarm
  • Electronic Security
  • Intercom Facility
  • Corner Location
  • Park Facing
  • Woodwork
  • Modular Kitchen
  • Marble Flooring
  • Granite Flooring
  • Wooden Flooring
  • Fly Proofing
  • Feng Shui / Vaastu Compliant
  • Servant Quarter
  • Swimming Pool
  • Park
  • Fitness Centre / GYM
  • Club / Community Center
  • Feng Shui / Vaastu Compliant
  • Club / Community Center
  • Park/Green Belt Facing

Configurations

Type Area Possession Price *
2BHK Apartment1,385 SqFeetImmediate/Ready to move₹ 1.16 crore
3BHK Apartment1,965 SqFeetImmediate/Ready to move₹ 1.57 crore
4BHK Apartment2,361 SqFeetImmediate/Ready to move₹ 2.58 crores
* Data has been collected from publicly available sources and may not be up to date.

RERA

P52100003653 Marvel Piazza phase -01 Completed

Confirmed with MahaRERA on 21 Sep 2026. Registered as "Marvel Piazza phase -01".

Promoter
MARVEL ZETA DEVELOPERS PVT LTD
Registered on
6 Aug 2017
Proposed completion
Dec 2022 (originally Jun 2021)
Project type
Residential / Group Housing
Planning authority
Others
Address as filed
S NO 226/1 , 226/2, LOHGAON, Haveli, Pune, 411047
Land area
21,606 sq m (232,572 sq ft)
Sanctioned built-up area
22,574 sq m (242,991 sq ft)
Buildings
A (6 floors); B (6 floors); C (6 floors); D (6 floors); E (6 floors); F (6 floors); G (6 floors); H (6 floors); J (6 floors); K (6 floors); L (6 floors)
Parking
Open Space 0, Closed/Covered 261
Complaints on the portal
25
BuildingUnit typeCarpet areaUnits
A4.5 BHK 171 sq m (1,839 sq ft) 2
A4.5 BHK 175 sq m (1,888 sq ft) 2
A3 BHK 123 sq m (1,323 sq ft) 1
A2 BHK 67 sq m (717 sq ft) 1
A2 BHK 70 sq m (757 sq ft) 1
A3 BHK 97 sq m (1,046 sq ft) 1
A3 BHK 100 sq m (1,077 sq ft) 1
A4.5 BHK 219 sq m (2,356 sq ft) 1
A4.5BHK 219 sq m (2,356 sq ft) 1
A2BHK 87 sq m (935 sq ft) 1
A3 BHK 120 sq m (1,291 sq ft) 1
A4.5 BHK 209 sq m (2,245 sq ft) 2
A2 BHK 91 sq m (978 sq ft) 1
B3BHK 106 sq m (1,139 sq ft) 1
B3.5BHK 171 sq m (1,837 sq ft) 1
B4BHK 219 sq m (2,361 sq ft) 1
B3BHK 120 sq m (1,291 sq ft) 1
B3BHK 129 sq m (1,389 sq ft) 1
B3BHK 103 sq m (1,108 sq ft) 1
B3BHK 101 sq m (1,087 sq ft) 1
B3BHK 98 sq m (1,056 sq ft) 1
B4.5BHK 176 sq m (1,899 sq ft) 2
B4.5BHK 171 sq m (1,845 sq ft) 2
B3.5BHK 148 sq m (1,594 sq ft) 1
B3.5BHK 145 sq m (1,556 sq ft) 1
B3BHK 128 sq m (1,382 sq ft) 1
B2BHK 124 sq m (1,331 sq ft) 1
B4.5BHK 209 sq m (2,251 sq ft) 1
B3.5BHK 176 sq m (1,892 sq ft) 1
C3.5BHK 177 sq m (1,907 sq ft) 1
C2BHK 78 sq m (843 sq ft) 1
C2BHK 68 sq m (737 sq ft) 1
C2BHK 68 sq m (729 sq ft) 1
C3.5BHK 149 sq m (1,608 sq ft) 1
C3.5BHK 146 sq m (1,570 sq ft) 1
C2BHK 78 sq m (842 sq ft) 1
C3BHK 128 sq m (1,382 sq ft) 1
C3BHK 103 sq m (1,108 sq ft) 1
C3BHK 106 sq m (1,139 sq ft) 1
C3.5BHK 171 sq m (1,841 sq ft) 1
C2BHK 87 sq m (936 sq ft) 1
C2BHK 87 sq m (935 sq ft) 1
C3BHK 129 sq m (1,389 sq ft) 1
C2BHK 92 sq m (989 sq ft) 1
C2BHK 99 sq m (1,062 sq ft) 1
D2BHK 73 sq m (782 sq ft) 1
D3BHK 101 sq m (1,090 sq ft) 2
D3BHK 105 sq m (1,133 sq ft) 2
D3BHK 129 sq m (1,384 sq ft) 1
D2BHK 87 sq m (935 sq ft) 1
D2BHK 87 sq m (939 sq ft) 1
D3.5BHK 129 sq m (1,384 sq ft) 1
D2BHK 69 sq m (740 sq ft) 1
D2BHK 72 sq m (778 sq ft) 1
D2BHK 68 sq m (736 sq ft) 1
D3BHK 128 sq m (1,376 sq ft) 2
D2BHK 98 sq m (1,060 sq ft) 1
D2BHK 99 sq m (1,064 sq ft) 1
E3BHK 103 sq m (1,109 sq ft) 2
E3BHK 106 sq m (1,139 sq ft) 2
E3.5BHK 176 sq m (1,890 sq ft) 1
E3BHK 124 sq m (1,335 sq ft) 1
E3BHK 128 sq m (1,382 sq ft) 2
E3.5BHK 144 sq m (1,553 sq ft) 1
E3.5BHK 148 sq m (1,591 sq ft) 1
E3BHK 129 sq m (1,389 sq ft) 1
E3BHK 120 sq m (1,293 sq ft) 1
E3.5BHK 171 sq m (1,835 sq ft) 1
E3BHK 129 sq m (1,389 sq ft) 1
E3BHK 101 sq m (1,089 sq ft) 1
E3BHK 98 sq m (1,058 sq ft) 1
F3.5BHK 132 sq m (1,424 sq ft) 1
F3.5BHK 161 sq m (1,729 sq ft) 1
F2BHK 88 sq m (946 sq ft) 2
F3BHK 129 sq m (1,387 sq ft) 1
F3.5BHK 166 sq m (1,784 sq ft) 1
F2BHK 87 sq m (936 sq ft) 1
F2BHK 67 sq m (725 sq ft) 2
F2BHK 87 sq m (936 sq ft) 1
F3.5BHK 137 sq m (1,473 sq ft) 1
F3BHK 104 sq m (1,115 sq ft) 1
F3BHK 129 sq m (1,388 sq ft) 1
F2BHK 65 sq m (698 sq ft) 2
F3BHK 106 sq m (1,145 sq ft) 1
G2BHK 86 sq m (927 sq ft) 1
G2BHK 87 sq m (939 sq ft) 1
G2BHK 87 sq m (936 sq ft) 1
G2BHK 71 sq m (760 sq ft) 1
G2BHK 68 sq m (732 sq ft) 1
G2BHK 68 sq m (727 sq ft) 1
G2BHK 65 sq m (698 sq ft) 1
G2BHK 71 sq m (769 sq ft) 1
G2BHK 69 sq m (740 sq ft) 1
G2BHK 91 sq m (982 sq ft) 1
G2BHK 88 sq m (948 sq ft) 1
G2BHK 92 sq m (990 sq ft) 1
H3.5BHK 163 sq m (1,754 sq ft) 2
H3BHK 128 sq m (1,380 sq ft) 2
H3.5BHK 130 sq m (1,399 sq ft) 2
H3.5BHK 133 sq m (1,436 sq ft) 2
H3BHK 103 sq m (1,107 sq ft) 2
H3BHK 106 sq m (1,137 sq ft) 2
H3BHK 129 sq m (1,387 sq ft) 1
H3.5BHK 166 sq m (1,788 sq ft) 1
H3.5BHK 166 sq m (1,788 sq ft) 1
H3BHK 129 sq m (1,387 sq ft) 1
J3BHK 122 sq m (1,312 sq ft) 1
J3.5BHK 165 sq m (1,776 sq ft) 1
J3.5BHK 132 sq m (1,423 sq ft) 1
J3.5BHK 136 sq m (1,461 sq ft) 1
J3BHK 97 sq m (1,039 sq ft) 1
J3BHK 99 sq m (1,069 sq ft) 1
J3.5BHK 166 sq m (1,792 sq ft) 1
J3BHK 126 sq m (1,353 sq ft) 1
K3.5BHK 166 sq m (1,788 sq ft) 1
K3.5BHK 166 sq m (1,788 sq ft) 1
K3BHK 129 sq m (1,387 sq ft) 1
K3BHK 106 sq m (1,137 sq ft) 2
K3BHK 103 sq m (1,106 sq ft) 2
K3.5BHK 133 sq m (1,436 sq ft) 2
K3.5BHK 130 sq m (1,399 sq ft) 2
K3BHK 128 sq m (1,380 sq ft) 2
K3.5BHK 163 sq m (1,754 sq ft) 2
K3BHK 129 sq m (1,387 sq ft) 1
L3BHK 126 sq m (1,359 sq ft) 2
L3BHK 129 sq m (1,387 sq ft) 1
L4.5BHK 219 sq m (2,361 sq ft) 1
L3.5BHK 166 sq m (1,789 sq ft) 1
L3BHK 129 sq m (1,387 sq ft) 1
L3BHK 104 sq m (1,115 sq ft) 2
L3BHK 101 sq m (1,084 sq ft) 2
L4.5BHK 178 sq m (1,917 sq ft) 1
L4.5BHK 175 sq m (1,884 sq ft) 1
L3.5BHK 130 sq m (1,395 sq ft) 1
L3.5BHK 127 sq m (1,364 sq ft) 1
L4.5BHK 211 sq m (2,274 sq ft) 1
L3.5BHK 159 sq m (1,707 sq ft) 1
Construction progress as reported to the portal

A

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
  • Sanitary Fittings within the flats / premises: 40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%

B

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 40%
  • Sanitary Fittings within the flats / premises: 10%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%

C

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
  • Sanitary Fittings within the flats / premises: 30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%

D

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 60%
  • Sanitary Fittings within the flats / premises: 30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%

E

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 20%
  • Sanitary Fittings within the flats / premises: 5%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%

F

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
  • Sanitary Fittings within the flats / premises: 0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%

G

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
  • Sanitary Fittings within the flats / premises: 5%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 5%

H

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 20%
  • Sanitary Fittings within the flats / premises: 40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 5%

J

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 80%
  • Sanitary Fittings within the flats / premises: 60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

K

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 35%
  • Sanitary Fittings within the flats / premises: 40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

L

  • Excavation: 100%
  • Basement (if any): 100%
  • Podiums (if any): 0%
  • Plinth: 100%
  • Stilt Floor: 0%
  • Slabs of Super Structure: 100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 35%
  • Sanitary Fittings within the flats / premises: 35%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%

Common areas and facilities

  • Internal Roads & Footpaths: 0% - INTERNAL ROAD
  • Water Supply: 0% - WATER INFRA : PLUMBING NETWORKING AND UGWT
  • Sewerage (Chamber, Lines, Septic Tank , STP): 0% - AS PER STATUTORY REQUIREMENTS
  • Storm Water Drains: 0% - AS PER STATUTORY REQUIREMENTS
  • Landscaping & Tree Planting: 0% - AS PER STATUTORY REQUIREMENTS
  • Street Lighting: 0% - AS PER DESIGN
  • Community Buildings: 0% - CLUB HOUSE
  • Treatment And Disposal Of Sewage And Sullage Water: 0% - AS PER STATUTORY REQUIREMENTS
  • Solid Waste Management And Disposal: 0% - AS PER STATUTORY REQUIREMENTS
  • Water conservation /Rain water harvesting: 0% - RAIN WATER HARVESTING
  • Energy managemcnt: 0% - SOLAR WATER HEATING SYSTEM
  • Fire protection and fire safety requirements: 0% - AS PER STATUTORY REQUIREMENTS
  • Electrical meter room, sub-station, receiving station: 0% - AS PER MSEDCL REQUIREMENTS
  • Aggregate area of recreational Open Space: 0% - AS PER STATUTORY REQUIREMENTS
RERA details are as filed by the promoter with the state authority and as read from its portal on the date shown; PropertyWala.com has not verified them independently.

Reviews

Be the first to write a review of Marvel Piazza and become a Project expert!
  • Post an informative review and get 1 additional basic property listing FREE of cost*.
  • Your review will be displayed prominently on your property listing page and other pages on the website.
  • For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
* The review must be factual, informative and unique.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Marvel Piazza
Cons:
Enter some negative aspects of Marvel Piazza

Location

Marvel Piazza, Viman Nagar, Pune - 411006 (Maharashtra)

* Location may be approximate

Nearby

  • Transport

    • Pune International Airport (~2 km)
    • Hindustan Petroleum Corporation Limited (~2 km)
    • Ramwadi (~3 km)
    • Pune Junction (~9 km)
    • Sangamwadi Private Bus Stand 2 (~9 km)
    • Hadapsar Gliding Centre (~14 km)
  • Shopping & Dining

    • Haldiram's (<1 km)
    • alag aasmaan (~1 km)
    • Dorabjee's - Viman Nagar (~1 km)
    • Marks & Spencer (~2 km)
    • Phoenix Avenue of Stars (~3 km)
    • Mahatma Phule Mandai (~13 km)
  • Healthcare

    • White Shine Multispeciality Dental Clinic (<1 km)
    • Dr. Bhoopat Singh Bhati | Urozoone Kidney care clinic (~1 km)
    • Healing Touch Multispeciality Clinic (~1 km)
    • Apollo Pharmacy (~2 km)
    • Medplus (~3 km)
    • CT Nursing Home (~3 km)
  • Education

    • Symbiosis International (<1 km)
    • Symbiosis International School (<1 km)
    • Symbosis International School (~2 km)
    • Aryabhatta Center (~7 km)
    • Deccan College (~7 km)
    • College of Engineering, Pune (~11 km)
  • Leisure & Entertainment

    • Udaan Biodiversity Park (~2 km)
    • Poona Club Golf Course (~5 km)
    • Gunjan Talkies (~6 km)
    • Army Sports Institute (~7 km)
    • Balgandharva Rangmandir (~12 km)
    • Jawaharlal Nehru Cricket Stadium (~14 km)
  • Services

    • HDFC Bank ATM (<1 km)
    • ICICI Bank (<1 km)
    • E- seva kendra (~4 km)
    • Kharadi Police Station (~7 km)
    • Pune Municipal Corporation Fire Station Wagholi (~9 km)
    • Wagholi Post Office (~11 km)
  • Religious Places

    • Anjuman Faizul Islam Masjid (~2 km)
    • St. Frances De Sales Church (~3 km)
    • Ayyappa Temple (~3 km)
    • Dhanalaxmi gannpati mandir (~4 km)
    • Rukmini Vitthal mandir (~4 km)
    • Hanuman Temple (~4 km)
  • Business & Hospitality

    • Polo Roche Business Avenue (<1 km)
    • Sky One Corporate Park (<1 km)
    • Four Points by Sheraton (~3 km)
    • Blue Diamond, Pune - IHCL SeleQtions (~6 km)
    • Hadapsar Industrial Estate (~10 km)
    • Automotive Research Association of India (ARAI) (~16 km)
Places © OpenStreetMap contributors, Overture Maps Foundation
Project ID
J791189989
Updated
Searches
10256
Views
1438