Marvel Piazza - Viman Nagar, Pune
- Builder
- Marvel Group
- Construction
- Completed
- Completion
- Dec, 2022
- Properties
- Apartments
- RERA
- P52100003653
Description
Safe haven for families
Marvel
Piazza is one of the residential developments by Marvel Groups located in
Pune. The project offers 2, 3 and 4 Bhk apartments and penthouses ranging between 1385 to 2361 sq.ft. which is spread over in the total area of 5.33 acres. at very
competitive and affordable price. It is well planned and is built with all
modern amenities.
Amenities
- Park
- Security
- Power Backup
- Water Supply
Marvel Realtors is one of the reputed names from Pune's real estate sector. Having a decade over experience, they promises world class services with finest infrastructure along with state of the art lifestyle.
Highlights
- Power Back-up
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- RO System
- Water Softner
- Centrally Air Conditioned
- Lifts
- High Speed Internet
- Wi-Fi
- RO System
- Balcony
- Basement
- Reserved Parking
- Security Guards
- Fire Alarm
- Electronic Security
- Intercom Facility
- Corner Location
- Park Facing
- Woodwork
- Modular Kitchen
- Marble Flooring
- Granite Flooring
- Wooden Flooring
- Fly Proofing
- Feng Shui / Vaastu Compliant
- Servant Quarter
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Feng Shui / Vaastu Compliant
- Club / Community Center
- Park/Green Belt Facing
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 2BHK Apartment | 1,385 SqFeet | Immediate/Ready to move | ₹ 1.16 crore |
| 3BHK Apartment | 1,965 SqFeet | Immediate/Ready to move | ₹ 1.57 crore |
| 4BHK Apartment | 2,361 SqFeet | Immediate/Ready to move | ₹ 2.58 crores |
RERA
P52100003653 Marvel Piazza phase -01 Completed
Confirmed with MahaRERA on 21 Sep 2026. Registered as "Marvel Piazza phase -01".
- Promoter
- MARVEL ZETA DEVELOPERS PVT LTD
- Registered on
- 6 Aug 2017
- Proposed completion
- Dec 2022 (originally Jun 2021)
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- S NO 226/1 , 226/2, LOHGAON, Haveli, Pune, 411047
- Land area
- 21,606 sq m (232,572 sq ft)
- Sanctioned built-up area
- 22,574 sq m (242,991 sq ft)
- Buildings
- A (6 floors); B (6 floors); C (6 floors); D (6 floors); E (6 floors); F (6 floors); G (6 floors); H (6 floors); J (6 floors); K (6 floors); L (6 floors)
- Parking
- Open Space 0, Closed/Covered 261
- Complaints on the portal
- 25
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| A | 4.5 BHK | 171 sq m (1,839 sq ft) | 2 |
| A | 4.5 BHK | 175 sq m (1,888 sq ft) | 2 |
| A | 3 BHK | 123 sq m (1,323 sq ft) | 1 |
| A | 2 BHK | 67 sq m (717 sq ft) | 1 |
| A | 2 BHK | 70 sq m (757 sq ft) | 1 |
| A | 3 BHK | 97 sq m (1,046 sq ft) | 1 |
| A | 3 BHK | 100 sq m (1,077 sq ft) | 1 |
| A | 4.5 BHK | 219 sq m (2,356 sq ft) | 1 |
| A | 4.5BHK | 219 sq m (2,356 sq ft) | 1 |
| A | 2BHK | 87 sq m (935 sq ft) | 1 |
| A | 3 BHK | 120 sq m (1,291 sq ft) | 1 |
| A | 4.5 BHK | 209 sq m (2,245 sq ft) | 2 |
| A | 2 BHK | 91 sq m (978 sq ft) | 1 |
| B | 3BHK | 106 sq m (1,139 sq ft) | 1 |
| B | 3.5BHK | 171 sq m (1,837 sq ft) | 1 |
| B | 4BHK | 219 sq m (2,361 sq ft) | 1 |
| B | 3BHK | 120 sq m (1,291 sq ft) | 1 |
| B | 3BHK | 129 sq m (1,389 sq ft) | 1 |
| B | 3BHK | 103 sq m (1,108 sq ft) | 1 |
| B | 3BHK | 101 sq m (1,087 sq ft) | 1 |
| B | 3BHK | 98 sq m (1,056 sq ft) | 1 |
| B | 4.5BHK | 176 sq m (1,899 sq ft) | 2 |
| B | 4.5BHK | 171 sq m (1,845 sq ft) | 2 |
| B | 3.5BHK | 148 sq m (1,594 sq ft) | 1 |
| B | 3.5BHK | 145 sq m (1,556 sq ft) | 1 |
| B | 3BHK | 128 sq m (1,382 sq ft) | 1 |
| B | 2BHK | 124 sq m (1,331 sq ft) | 1 |
| B | 4.5BHK | 209 sq m (2,251 sq ft) | 1 |
| B | 3.5BHK | 176 sq m (1,892 sq ft) | 1 |
| C | 3.5BHK | 177 sq m (1,907 sq ft) | 1 |
| C | 2BHK | 78 sq m (843 sq ft) | 1 |
| C | 2BHK | 68 sq m (737 sq ft) | 1 |
| C | 2BHK | 68 sq m (729 sq ft) | 1 |
| C | 3.5BHK | 149 sq m (1,608 sq ft) | 1 |
| C | 3.5BHK | 146 sq m (1,570 sq ft) | 1 |
| C | 2BHK | 78 sq m (842 sq ft) | 1 |
| C | 3BHK | 128 sq m (1,382 sq ft) | 1 |
| C | 3BHK | 103 sq m (1,108 sq ft) | 1 |
| C | 3BHK | 106 sq m (1,139 sq ft) | 1 |
| C | 3.5BHK | 171 sq m (1,841 sq ft) | 1 |
| C | 2BHK | 87 sq m (936 sq ft) | 1 |
| C | 2BHK | 87 sq m (935 sq ft) | 1 |
| C | 3BHK | 129 sq m (1,389 sq ft) | 1 |
| C | 2BHK | 92 sq m (989 sq ft) | 1 |
| C | 2BHK | 99 sq m (1,062 sq ft) | 1 |
| D | 2BHK | 73 sq m (782 sq ft) | 1 |
| D | 3BHK | 101 sq m (1,090 sq ft) | 2 |
| D | 3BHK | 105 sq m (1,133 sq ft) | 2 |
| D | 3BHK | 129 sq m (1,384 sq ft) | 1 |
| D | 2BHK | 87 sq m (935 sq ft) | 1 |
| D | 2BHK | 87 sq m (939 sq ft) | 1 |
| D | 3.5BHK | 129 sq m (1,384 sq ft) | 1 |
| D | 2BHK | 69 sq m (740 sq ft) | 1 |
| D | 2BHK | 72 sq m (778 sq ft) | 1 |
| D | 2BHK | 68 sq m (736 sq ft) | 1 |
| D | 3BHK | 128 sq m (1,376 sq ft) | 2 |
| D | 2BHK | 98 sq m (1,060 sq ft) | 1 |
| D | 2BHK | 99 sq m (1,064 sq ft) | 1 |
| E | 3BHK | 103 sq m (1,109 sq ft) | 2 |
| E | 3BHK | 106 sq m (1,139 sq ft) | 2 |
| E | 3.5BHK | 176 sq m (1,890 sq ft) | 1 |
| E | 3BHK | 124 sq m (1,335 sq ft) | 1 |
| E | 3BHK | 128 sq m (1,382 sq ft) | 2 |
| E | 3.5BHK | 144 sq m (1,553 sq ft) | 1 |
| E | 3.5BHK | 148 sq m (1,591 sq ft) | 1 |
| E | 3BHK | 129 sq m (1,389 sq ft) | 1 |
| E | 3BHK | 120 sq m (1,293 sq ft) | 1 |
| E | 3.5BHK | 171 sq m (1,835 sq ft) | 1 |
| E | 3BHK | 129 sq m (1,389 sq ft) | 1 |
| E | 3BHK | 101 sq m (1,089 sq ft) | 1 |
| E | 3BHK | 98 sq m (1,058 sq ft) | 1 |
| F | 3.5BHK | 132 sq m (1,424 sq ft) | 1 |
| F | 3.5BHK | 161 sq m (1,729 sq ft) | 1 |
| F | 2BHK | 88 sq m (946 sq ft) | 2 |
| F | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| F | 3.5BHK | 166 sq m (1,784 sq ft) | 1 |
| F | 2BHK | 87 sq m (936 sq ft) | 1 |
| F | 2BHK | 67 sq m (725 sq ft) | 2 |
| F | 2BHK | 87 sq m (936 sq ft) | 1 |
| F | 3.5BHK | 137 sq m (1,473 sq ft) | 1 |
| F | 3BHK | 104 sq m (1,115 sq ft) | 1 |
| F | 3BHK | 129 sq m (1,388 sq ft) | 1 |
| F | 2BHK | 65 sq m (698 sq ft) | 2 |
| F | 3BHK | 106 sq m (1,145 sq ft) | 1 |
| G | 2BHK | 86 sq m (927 sq ft) | 1 |
| G | 2BHK | 87 sq m (939 sq ft) | 1 |
| G | 2BHK | 87 sq m (936 sq ft) | 1 |
| G | 2BHK | 71 sq m (760 sq ft) | 1 |
| G | 2BHK | 68 sq m (732 sq ft) | 1 |
| G | 2BHK | 68 sq m (727 sq ft) | 1 |
| G | 2BHK | 65 sq m (698 sq ft) | 1 |
| G | 2BHK | 71 sq m (769 sq ft) | 1 |
| G | 2BHK | 69 sq m (740 sq ft) | 1 |
| G | 2BHK | 91 sq m (982 sq ft) | 1 |
| G | 2BHK | 88 sq m (948 sq ft) | 1 |
| G | 2BHK | 92 sq m (990 sq ft) | 1 |
| H | 3.5BHK | 163 sq m (1,754 sq ft) | 2 |
| H | 3BHK | 128 sq m (1,380 sq ft) | 2 |
| H | 3.5BHK | 130 sq m (1,399 sq ft) | 2 |
| H | 3.5BHK | 133 sq m (1,436 sq ft) | 2 |
| H | 3BHK | 103 sq m (1,107 sq ft) | 2 |
| H | 3BHK | 106 sq m (1,137 sq ft) | 2 |
| H | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| H | 3.5BHK | 166 sq m (1,788 sq ft) | 1 |
| H | 3.5BHK | 166 sq m (1,788 sq ft) | 1 |
| H | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| J | 3BHK | 122 sq m (1,312 sq ft) | 1 |
| J | 3.5BHK | 165 sq m (1,776 sq ft) | 1 |
| J | 3.5BHK | 132 sq m (1,423 sq ft) | 1 |
| J | 3.5BHK | 136 sq m (1,461 sq ft) | 1 |
| J | 3BHK | 97 sq m (1,039 sq ft) | 1 |
| J | 3BHK | 99 sq m (1,069 sq ft) | 1 |
| J | 3.5BHK | 166 sq m (1,792 sq ft) | 1 |
| J | 3BHK | 126 sq m (1,353 sq ft) | 1 |
| K | 3.5BHK | 166 sq m (1,788 sq ft) | 1 |
| K | 3.5BHK | 166 sq m (1,788 sq ft) | 1 |
| K | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| K | 3BHK | 106 sq m (1,137 sq ft) | 2 |
| K | 3BHK | 103 sq m (1,106 sq ft) | 2 |
| K | 3.5BHK | 133 sq m (1,436 sq ft) | 2 |
| K | 3.5BHK | 130 sq m (1,399 sq ft) | 2 |
| K | 3BHK | 128 sq m (1,380 sq ft) | 2 |
| K | 3.5BHK | 163 sq m (1,754 sq ft) | 2 |
| K | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| L | 3BHK | 126 sq m (1,359 sq ft) | 2 |
| L | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| L | 4.5BHK | 219 sq m (2,361 sq ft) | 1 |
| L | 3.5BHK | 166 sq m (1,789 sq ft) | 1 |
| L | 3BHK | 129 sq m (1,387 sq ft) | 1 |
| L | 3BHK | 104 sq m (1,115 sq ft) | 2 |
| L | 3BHK | 101 sq m (1,084 sq ft) | 2 |
| L | 4.5BHK | 178 sq m (1,917 sq ft) | 1 |
| L | 4.5BHK | 175 sq m (1,884 sq ft) | 1 |
| L | 3.5BHK | 130 sq m (1,395 sq ft) | 1 |
| L | 3.5BHK | 127 sq m (1,364 sq ft) | 1 |
| L | 4.5BHK | 211 sq m (2,274 sq ft) | 1 |
| L | 3.5BHK | 159 sq m (1,707 sq ft) | 1 |
Construction progress as reported to the portal
A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 50%
B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 40%
- Sanitary Fittings within the flats / premises: 10%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 60%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%
C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 75%
- Sanitary Fittings within the flats / premises: 30%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%
D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 60%
- Sanitary Fittings within the flats / premises: 30%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 20%
E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 20%
- Sanitary Fittings within the flats / premises: 5%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 90%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%
F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 10%
- Sanitary Fittings within the flats / premises: 0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 10%
G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 30%
- Sanitary Fittings within the flats / premises: 5%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 5%
H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 20%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 70%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 5%
J
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 80%
- Sanitary Fittings within the flats / premises: 60%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 80%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 85%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
K
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 35%
- Sanitary Fittings within the flats / premises: 40%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 20%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
L
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 35%
- Sanitary Fittings within the flats / premises: 35%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 70%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 20%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 0%
Common areas and facilities
- Internal Roads & Footpaths: 0% - INTERNAL ROAD
- Water Supply: 0% - WATER INFRA : PLUMBING NETWORKING AND UGWT
- Sewerage (Chamber, Lines, Septic Tank , STP): 0% - AS PER STATUTORY REQUIREMENTS
- Storm Water Drains: 0% - AS PER STATUTORY REQUIREMENTS
- Landscaping & Tree Planting: 0% - AS PER STATUTORY REQUIREMENTS
- Street Lighting: 0% - AS PER DESIGN
- Community Buildings: 0% - CLUB HOUSE
- Treatment And Disposal Of Sewage And Sullage Water: 0% - AS PER STATUTORY REQUIREMENTS
- Solid Waste Management And Disposal: 0% - AS PER STATUTORY REQUIREMENTS
- Water conservation /Rain water harvesting: 0% - RAIN WATER HARVESTING
- Energy managemcnt: 0% - SOLAR WATER HEATING SYSTEM
- Fire protection and fire safety requirements: 0% - AS PER STATUTORY REQUIREMENTS
- Electrical meter room, sub-station, receiving station: 0% - AS PER MSEDCL REQUIREMENTS
- Aggregate area of recreational Open Space: 0% - AS PER STATUTORY REQUIREMENTS
Reviews
Write a review
Be the first to write a review of Marvel Piazza and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Please try to write your review from a neutral point of view.
Pros:
Enter some positive aspects of Marvel Piazza
Enter some positive aspects of Marvel Piazza
Cons:
Enter some negative aspects of Marvel Piazza
Enter some negative aspects of Marvel Piazza
Location
Marvel Piazza, Viman Nagar, Pune - 411006 (Maharashtra)
Nearby
-
Transport
- Pune International Airport (~2 km)
- Hindustan Petroleum Corporation Limited (~2 km)
- Ramwadi (~3 km)
- Pune Junction (~9 km)
- Sangamwadi Private Bus Stand 2 (~9 km)
- Hadapsar Gliding Centre (~14 km)
-
Shopping & Dining
- Haldiram's (<1 km)
- alag aasmaan (~1 km)
- Dorabjee's - Viman Nagar (~1 km)
- Marks & Spencer (~2 km)
- Phoenix Avenue of Stars (~3 km)
- Mahatma Phule Mandai (~13 km)
-
Healthcare
- White Shine Multispeciality Dental Clinic (<1 km)
- Dr. Bhoopat Singh Bhati | Urozoone Kidney care clinic (~1 km)
- Healing Touch Multispeciality Clinic (~1 km)
- Apollo Pharmacy (~2 km)
- Medplus (~3 km)
- CT Nursing Home (~3 km)
-
Education
- Symbiosis International (<1 km)
- Symbiosis International School (<1 km)
- Symbosis International School (~2 km)
- Aryabhatta Center (~7 km)
- Deccan College (~7 km)
- College of Engineering, Pune (~11 km)
-
Leisure & Entertainment
- Udaan Biodiversity Park (~2 km)
- Poona Club Golf Course (~5 km)
- Gunjan Talkies (~6 km)
- Army Sports Institute (~7 km)
- Balgandharva Rangmandir (~12 km)
- Jawaharlal Nehru Cricket Stadium (~14 km)
-
Services
- HDFC Bank ATM (<1 km)
- ICICI Bank (<1 km)
- E- seva kendra (~4 km)
- Kharadi Police Station (~7 km)
- Pune Municipal Corporation Fire Station Wagholi (~9 km)
- Wagholi Post Office (~11 km)
-
Religious Places
- Anjuman Faizul Islam Masjid (~2 km)
- St. Frances De Sales Church (~3 km)
- Ayyappa Temple (~3 km)
- Dhanalaxmi gannpati mandir (~4 km)
- Rukmini Vitthal mandir (~4 km)
- Hanuman Temple (~4 km)
-
Business & Hospitality
- Polo Roche Business Avenue (<1 km)
- Sky One Corporate Park (<1 km)
- Four Points by Sheraton (~3 km)
- Blue Diamond, Pune - IHCL SeleQtions (~6 km)
- Hadapsar Industrial Estate (~10 km)
- Automotive Research Association of India (ARAI) (~16 km)
- Project ID
- J791189989
- Updated
- Searches
- 10256
- Views
- 1438