


Lodha Palava City - Dombivli, Thane
- Builder
- Lodha Builders Private Limited
- Construction
- Completed
- Completion
- Jan, 2018
- Properties
- Apartments
- RERA
- P51700000125
Description
highest levels of safety and security
Lodha Palava City: is located at Dombivali, Thane. offers 1, 2 & 3 BHK apartments ranging from 443-845 sqft. The project is spread over 4500 acres of land. It consists of 100 buildings with 14 floors. This beautiful project comes with Waterfront, Lakeside Park, Retail high street, Club house, Multiple renowned schools across various boards, Olympic sports centre, temple hospital etc.- Club House
- Coffee Lounge & Restaurants
- Cafeteria/Food Court Bar/Lounge
- Jogging and Strolling Track
- Outdoor Tennis Courts
- Cycling & Jogging Track
- Private Terrace/Garden
- Barbeque Pit
- Dance Studio
- Power Back Up
- Swimming Pool
- Lift
- Security
- Park Reserved
- Parking
- Service/Goods Lift Visitor Parking
- Intercom Facility
- Maintenance Staff
- Bank & ATM
- Banquet Hall
- Guest Accommodation
- Gymnasium
- Indoor Games Room
- Kids Club AEROBICS ROOM Concierge Services
- DTH Television Facility
- Flower Gardens
- Laundry Service
- Library And Business Centre
- Piped Gas
- Rain Water Harvesting
- Recreational Pool
- Rentable Community Space
- Retail Boulevard (Retail Shops)
- RO Water System
- Water Storage
- Air Conditioned
- Canopy Walk
- Indoor Squash & Badminton Courts
- Arts & Craft Studio
- Multipurpose Courts Meditation Area
- Vaastu Compliant
- Internet/Wi-Fi Connectivity
- Waste Disposal
- Conference Room
- Activity Deck4
- Outdoor Tennis Courts
- Event Space & Amphitheatre
- Early Learning Centre
- Kids Play Pool With Water Slides
- Fire Fighting Equipment
Highlights
- Power Back-up
- Water Softner
- Visitor Parking
- Maintenance Staff
- Water Supply / Storage
- Rain Water Harvesting
- Waste Disposal
- Centrally Air Conditioned
- Room AC
- Lifts
- High Speed Internet
- Wi-Fi
- RO System
- Private Terrace
- Reserved Parking
- Security Guards
- Fire Alarm
- Electronic Security
- Intercom Facility
- Park Facing
- Feng Shui / Vaastu Compliant
- Swimming Pool
- Park
- Fitness Centre / GYM
- Club / Community Center
- Cafeteria / Food Court
- Conference room
- ATM
- Service / Goods Lift
- High Speed Internet / Wi-Fi
- Feng Shui / Vaastu Compliant
- Club / Community Center
- Adjacent to Main Road
- Water Connection
- Electric Connection
- Close to Hospital
- Close to School
- Close to Shopping Center/Mall
Configurations
| Type | Area | Possession | Price * |
|---|---|---|---|
| 1BHK Apartment | 305 SqFeet | Immediate/Ready to move | ₹ 18 lakhs |
| 1BHK Apartment | 443 SqFeet | Immediate/Ready to move | ₹ 43.99 lakhs |
| 2BHK Apartment | 583 SqFeet | Immediate/Ready to move | ₹ 57.99 lakhs |
| 3BHK Apartment | 845 SqFeet | Immediate/Ready to move | ₹ 87 lakhs |
RERA
P51700000125 PALAVA - ELITE - A to J Completed
Confirmed with MahaRERA on 25 Sep 2026. Registered as "PALAVA - ELITE - A to J".
- Promoter
- Palava Dwellers Private Limited
- Registered on
- 5 Jul 2017
- Proposed completion
- Jan 2018
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- ., ., Khoni, Kalyan, Thane, 421202
- Land area
- 8,134 sq m (87,557 sq ft)
- Sanctioned built-up area
- 48,164 sq m (518,446 sq ft)
- Buildings
- ELITE A (18 floors); ELITE B (18 floors); ELITE C (18 floors); ELITE D (18 floors); ELITE E (18 floors); ELITE F (18 floors); ELITE G (18 floors); ELITE H (18 floors); ELITE I (18 floors); ELITE J (18 floors)
- Parking
- Open Space 106, Closed/Covered 839
- Complaints on the portal
- 3
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| ELITE A | 1BHK | 45 sq m (489 sq ft) | 1 |
| ELITE A | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE A | 1BHK | 43 sq m (464 sq ft) | 1 |
| ELITE A | 1BHK | 42 sq m (454 sq ft) | 3 |
| ELITE A | 1BHK | 44 sq m (478 sq ft) | 2 |
| ELITE A | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE A | 1BHK | 46 sq m (493 sq ft) | 6 |
| ELITE A | 1BHK | 46 sq m (497 sq ft) | 2 |
| ELITE A | 1BHK | 46 sq m (493 sq ft) | 2 |
| ELITE A | 1BHK | 44 sq m (470 sq ft) | 1 |
| ELITE A | 1BHK | 42 sq m (449 sq ft) | 2 |
| ELITE A | 1BHK | 44 sq m (478 sq ft) | 7 |
| ELITE A | 1BHK | 42 sq m (456 sq ft) | 29 |
| ELITE A | 1BHK | 46 sq m (496 sq ft) | 7 |
| ELITE A | 1BHK | 44 sq m (474 sq ft) | 6 |
| ELITE A | 1BHK | 44 sq m (475 sq ft) | 2 |
| ELITE A | 1BHK | 42 sq m (453 sq ft) | 32 |
| ELITE B | 2BHKOPTIMA | 55 sq m (593 sq ft) | 1 |
| ELITE B | 1BHK | 46 sq m (495 sq ft) | 1 |
| ELITE B | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE B | 2BHKOPTIMA | 52 sq m (556 sq ft) | 1 |
| ELITE B | 1BHK | 31 sq m (334 sq ft) | 2 |
| ELITE B | 2BHKOPTIMA | 55 sq m (595 sq ft) | 66 |
| ELITE C | 1BHK | 46 sq m (497 sq ft) | 1 |
| ELITE C | 1BHK | 42 sq m (454 sq ft) | 2 |
| ELITE C | 1BHK | 42 sq m (447 sq ft) | 1 |
| ELITE C | 1BHK | 39 sq m (425 sq ft) | 1 |
| ELITE C | 1BHK | 46 sq m (493 sq ft) | 2 |
| ELITE C | 1BHK | 44 sq m (478 sq ft) | 8 |
| ELITE C | 1BHK | 46 sq m (493 sq ft) | 6 |
| ELITE C | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE C | 1BHK | 42 sq m (453 sq ft) | 31 |
| ELITE C | 1BHK | 44 sq m (474 sq ft) | 8 |
| ELITE C | 1BHK | 42 sq m (456 sq ft) | 31 |
| ELITE C | 1BHK | 42 sq m (449 sq ft) | 2 |
| ELITE C | 2BHK | 58 sq m (629 sq ft) | 1 |
| ELITE C | 1BHK | 46 sq m (496 sq ft) | 8 |
| ELITE C | 1BHK | 44 sq m (470 sq ft) | 1 |
| ELITE C | 1BHK | 46 sq m (490 sq ft) | 1 |
| ELITE D | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE D | 2BHKOPTIMA | 52 sq m (556 sq ft) | 1 |
| ELITE D | 2BHKOPTIMA | 55 sq m (593 sq ft) | 1 |
| ELITE D | 1BHK | 31 sq m (334 sq ft) | 2 |
| ELITE D | 1BHK | 46 sq m (495 sq ft) | 1 |
| ELITE D | 2BHKOPTIMA | 55 sq m (595 sq ft) | 66 |
| ELITE E | 1BHK | 42 sq m (453 sq ft) | 31 |
| ELITE E | 2BHK | 58 sq m (629 sq ft) | 1 |
| ELITE E | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE E | 1BHK | 44 sq m (470 sq ft) | 1 |
| ELITE E | 1BHK | 42 sq m (449 sq ft) | 1 |
| ELITE E | 1BHK | 44 sq m (478 sq ft) | 9 |
| ELITE E | 1BHK | 42 sq m (456 sq ft) | 31 |
| ELITE E | 1BHK | 46 sq m (493 sq ft) | 8 |
| ELITE E | 1BHK | 44 sq m (474 sq ft) | 7 |
| ELITE E | 1BHK | 46 sq m (496 sq ft) | 8 |
| ELITE E | 1BHK | 46 sq m (497 sq ft) | 1 |
| ELITE E | 1BHK | 44 sq m (475 sq ft) | 1 |
| ELITE E | 1BHK | 42 sq m (454 sq ft) | 3 |
| ELITE E | 1BHK | 42 sq m (450 sq ft) | 1 |
| ELITE F | 1BHK | 42 sq m (453 sq ft) | 33 |
| ELITE F | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE F | 1BHK | 46 sq m (493 sq ft) | 6 |
| ELITE F | 1BHK | 47 sq m (501 sq ft) | 1 |
| ELITE F | 1BHK | 42 sq m (449 sq ft) | 2 |
| ELITE F | 1BHK | 43 sq m (465 sq ft) | 1 |
| ELITE F | 1BHK | 43 sq m (458 sq ft) | 1 |
| ELITE F | 1BHK | 46 sq m (493 sq ft) | 2 |
| ELITE F | 1BHK | 44 sq m (478 sq ft) | 1 |
| ELITE F | 1BHK | 42 sq m (456 sq ft) | 30 |
| ELITE F | 1BHK | 42 sq m (454 sq ft) | 1 |
| ELITE F | 1BHK | 39 sq m (425 sq ft) | 1 |
| ELITE F | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE F | 1BHK | 44 sq m (475 sq ft) | 1 |
| ELITE F | 1BHK | 46 sq m (497 sq ft) | 1 |
| ELITE F | 1BHK | 44 sq m (474 sq ft) | 7 |
| ELITE F | 1BHK | 44 sq m (478 sq ft) | 8 |
| ELITE F | 1BHK | 46 sq m (496 sq ft) | 6 |
| ELITE G | 1BHK | 46 sq m (495 sq ft) | 1 |
| ELITE G | 2BHKOPTIMA | 57 sq m (611 sq ft) | 2 |
| ELITE G | 1BHK | 31 sq m (334 sq ft) | 1 |
| ELITE G | 1BHK | 31 sq m (334 sq ft) | 1 |
| ELITE G | 2BHKOPTIMA | 55 sq m (595 sq ft) | 64 |
| ELITE G | 2BHKOPTIMA | 52 sq m (556 sq ft) | 1 |
| ELITE G | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE G | 2BHKOPTIMA | 55 sq m (593 sq ft) | 1 |
| ELITE H | 1BHK | 44 sq m (471 sq ft) | 1 |
| ELITE H | 1BHK | 42 sq m (447 sq ft) | 2 |
| ELITE H | 1BHK | 39 sq m (425 sq ft) | 1 |
| ELITE H | 1BHK | 42 sq m (454 sq ft) | 2 |
| ELITE H | 1BHK | 44 sq m (478 sq ft) | 1 |
| ELITE H | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE H | 1BHK | 44 sq m (475 sq ft) | 2 |
| ELITE H | 1BHK | 46 sq m (497 sq ft) | 3 |
| ELITE H | 1BHK | 46 sq m (493 sq ft) | 6 |
| ELITE H | 1BHK | 43 sq m (465 sq ft) | 2 |
| ELITE H | 1BHK | 46 sq m (496 sq ft) | 4 |
| ELITE H | 1BHK | 42 sq m (453 sq ft) | 32 |
| ELITE H | 1BHK | 44 sq m (478 sq ft) | 6 |
| ELITE H | 1BHK | 46 sq m (493 sq ft) | 2 |
| ELITE H | 1BHK | 42 sq m (456 sq ft) | 30 |
| ELITE H | 1BHK | 44 sq m (474 sq ft) | 6 |
| ELITE H | 1BHK | 42 sq m (449 sq ft) | 2 |
| ELITE H | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE H | 1BHK | 45 sq m (489 sq ft) | 1 |
| ELITE I | 1BHK | 31 sq m (334 sq ft) | 1 |
| ELITE I | 2BHKOPTIMA | 55 sq m (595 sq ft) | 63 |
| ELITE I | 1BHK | 46 sq m (495 sq ft) | 1 |
| ELITE I | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE I | 2BHKOPTIMA | 52 sq m (556 sq ft) | 1 |
| ELITE I | 2BHKOPTIMA | 55 sq m (593 sq ft) | 1 |
| ELITE I | 1BHK | 29 sq m (313 sq ft) | 1 |
| ELITE I | 2BHKOPTIMA | 57 sq m (611 sq ft) | 3 |
| ELITE J | 1BHK | 42 sq m (447 sq ft) | 2 |
| ELITE J | 1BHK | 46 sq m (490 sq ft) | 1 |
| ELITE J | 1BHK | 44 sq m (474 sq ft) | 8 |
| ELITE J | 1BHK | 46 sq m (493 sq ft) | 4 |
| ELITE J | 1BHK | 46 sq m (497 sq ft) | 3 |
| ELITE J | 1BHK | 42 sq m (457 sq ft) | 1 |
| ELITE J | 1BHK | 35 sq m (381 sq ft) | 2 |
| ELITE J | 1BHK | 39 sq m (425 sq ft) | 1 |
| ELITE J | 1BHK | 46 sq m (496 sq ft) | 6 |
| ELITE J | 1BHK | 44 sq m (478 sq ft) | 1 |
| ELITE J | 1BHK | 44 sq m (478 sq ft) | 6 |
| ELITE J | 1BHK | 42 sq m (456 sq ft) | 30 |
| ELITE J | 1BHK | 46 sq m (493 sq ft) | 4 |
| ELITE J | 1BHK | 42 sq m (453 sq ft) | 34 |
| ELITE J | 1BHK | 42 sq m (449 sq ft) | 2 |
| ELITE J | 1BHK | 44 sq m (471 sq ft) | 1 |
Construction progress as reported to the portal
ELITE A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE E
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE H
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE I
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
ELITE J
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 0%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 100% - NA
- Water Supply: 100% - NA
- Sewerage (Chamber, Lines, Septic Tank , STP): 100% - NA
- Storm Water Drains: 100% - NA
- Landscaping & Tree Planting: 100% - NA
- Street Lighting: 100% - NA
- Community Buildings: 100% - Shared across multiple phase of realestateprojects
- Treatment And Disposal Of Sewage And Sullage Water: 100% - NA
- Solid Waste Management And Disposal: 0% - NA
- Water conservation /Rain water harvesting: 100% - NA
- Energy managemcnt: 100% - NA
- Fire protection and fire safety requirements: 100% - NA
- Electrical meter room, sub-station, receiving station: 100% - NA
- Aggregate area of recreational Open Space: 100% - NA
- Open Parking: 100% - NA
- Clubhouse: 100% - NA
- Sports Complex: 100% - NA
- Temple: 100% - NA
- Woodlands Park: 100% - NA
Reviews
Be the first to write a review of Lodha Palava City and become a Project expert!
- Post an informative review and get 1 additional basic property listing FREE of cost*.
- Your review will be displayed prominently on your property listing page and other pages on the website.
- For Brokers & Builders: Your review will be displayed on your profile and your profile will get more visibility from all the pages your review appears on.
Enter some positive aspects of Lodha Palava City
Enter some negative aspects of Lodha Palava City
News
FM India Leases 1.31 Lakh Sq Ft at Lodha Industrial Park
Hindustan Times · · Commercial
FM India Supply Chain leased 1.31 lakh sq ft at Lodha Industrial Park in Palava City for five years, with total rent exceeding ₹33 crore.
Key facts
FM India Supply Chain Private Limited leased 1.31 lakh sq ft of industrial space at Lodha Industrial Park in Palava City, Thane district, for five years at total rent exceeding ₹33 crore. The property is owned by Palava Induslogic 4 Private Limited, a Lodha Developers subsidiary.
The agreement sets starting monthly rent at ₹50.37 lakh, or about ₹31.60 per sq ft per month, with annual rent escalation. The security deposit is ₹2.65 crore, and the tenant will pay more than ₹2.11 crore in common area maintenance charges. Registered on October 28, 2025, the lease incurred ₹1.78 lakh in stamp duty.
Lodha Palava City Penthouses Sell for ₹15.59 Crore, Setting Local Record
Hindustan Times · · Residential
Two 4,754-square-foot penthouses at Lodha Hanging Gardens sold for ₹15.59 crore, or ₹16,400 per square foot, setting a locality record.
Key facts
Two 35th-floor penthouses at Lodha Hanging Gardens, Lodha Palava City, Dombivli, sold for ₹15.59 crore. Each measures 4,754 sq ft; together they were sold with 10 parking spaces at ₹16,400 per sq ft, a local record. Registered on August 29, the sale incurred ₹54.6 lakh in stamp duty and a ₹60,000 registration fee. Buyers were Ali Asgar Khargunwala and Fatema Anguthiwala. The building is under construction and MahaRERA lists completion for March 2030.
In 2024, two Lodha Palava apartments sold at ₹14,000 and ₹15,000 per sq ft. Nearby apartments under construction by Grade A developers are priced at ₹9,500–₹11,000 per sq ft.
Nilje Bridge Reconstruction Brings Kalyan-Shil Road Diversions Until October
The Free Press Journal · · Infrastructure
Traffic diversions for Nilje railway overbridge reconstruction on Kalyan-Shil Road will remain in force from June 1 to October 31, 2026.
Key facts
The Thane traffic police have ordered closures and diversions for reconstruction of the low-height Nilje Railway Over Bridge on State Highway 76, near Lodha Palava and Xperia Mall. The work is part of the Dedicated Freight Corridor Project being executed by Tata Project Limited. Restrictions run from 12:01 am on June 1, 2026, until midnight on October 31; police, ambulances, fire brigade and other emergency vehicles are exempt.
- Kalyan-to-Shilphata traffic must divert via Lodha Palava and Mahalaxmi Hotel road. Traffic from Lodha Palava, Casabella, Lodha Haven and Xperia Mall towards Kalyan must go via Shilphata, Desai Creek Bridge, a U-turn near Saraswati Textile and the new Palava Flyover.
- Heavy vehicles from Mumbra/Kalyan Phata towards Kalyan must use Shilphata-Mumbra Bypass and Kharegaon Toll Plaza. Vehicles from Kalyan towards Mumbra/Kalyan Phata must turn at Katai Chowk and use Khoni Naka-Taloja MIDC. Navi Mumbai/Taloja traffic towards Katai/Badlapur uses Badlapur Pipeline-Newali; Ambernath/Badlapur traffic uses Taloja MIDC.
- Light-vehicle alternatives include Kalyan Phata-Shilphata-Diva-Manpada; Nashik-Mumbai Highway via Gankoli, Motagaon or Ranjnoli Bypass-Kongaon; Shri Malang Road-Newali- Badlapur Pipeline-Khoni Naka-Taloja MIDC; and routes via Mankoli Naka or Durgadi-Kongaon.
Location
Lodha Palava City, Dombivli, Thane - 421202 (Maharashtra)
Nearby
-
Transport
- Jio-bp (<1 km)
- Diva Junction (~6 km)
- Dombivali MSRTC Bus Terminal (~8 km)
- Sarovar Vihar (CBD Belapur) (~24 km)
- Navi Mumbai International Airport (~28 km)
- Chhatrapati Shivaji Maharaj International Airport (~33 km)
-
Shopping & Dining
- Café Coffee Day (<1 km)
- Lodha Xperia Mall (<1 km)
- Burger King (<1 km)
- Royal (~3 km)
- D'Mart (~4 km)
- Local Market (~13 km)
-
Healthcare
- Apollo Pharmacy Riverwood Park (~1 km)
- Jupiter Hospital (~3 km)
- TMC Kausa Health Centre (~6 km)
- Shree Ashirwad Hospital, Dombivli (~7 km)
- Sai Jyot hospital (~7 km)
- VOCARD (~8 km)
-
Education
- Casa Rio Gold Library (~3 km)
- Dosti Foundation School (~6 km)
- Greens English School (~8 km)
- Dhirubhai Ambani Knowledge City (~13 km)
- Shrimati Indira Gandhi College of Engineering (~13 km)
- Indian Institute of Technology Bombay (~25 km)
-
Leisure & Entertainment
- Meenatai Thakrey Udhyan (~8 km)
- Tilak Movie Theater (~8 km)
- KDMC sports complex (~9 km)
- Mukund Keni Playground (~13 km)
- Kharghar Valley Golf Course (~17 km)
- Butterfly Park (~22 km)
-
Services
- HDFC Bank ATM (<1 km)
- Axis Bank (<1 km)
- Mumbra Post Office (~8 km)
- Vishnunagar Police Station (~8 km)
- R.T.O. Kalyan (~11 km)
- Rustomjee Fire Station (~14 km)
-
Religious Places
- Khidkali Mahadev Mandir खिडकाळी महादेव मंदिर (~2 km)
- Shri Guru Datt Temple (~2 km)
- SHRI GANAPATI MANDIR (~3 km)
-
Business & Hospitality
- Reliance Corporate Park (~11 km)
- Mukund Steel (~11 km)
- Millennium Business Park, Mahape Village (~12 km)
- Country Inn Hotel & Suites (~12 km)
- Maharashtra Industrial Development Centre - MIDC Taloja (~16 km)
- Navi Mumbai Marriott Hotel (~17 km)
- Project ID
- J118976431
- Updated
- Searches
- 2535
- Views
- 1700











