


3 Bedroom Apartment for rent in Pride World City, Dhanorie, Pune
- Project
- Pride World City
- RERA
- P52100026529
- Property Type
- Apartment
- Area
- 1280 SqFeet
- Rate
- ₹ 25 / SqFeet
- Bedrooms
- 3
- Bathrooms
- 3
- Floor
- 8th
- Total Floors
- 16
- Furnished
- Semi Furnished
- Facing
- East
- Lease Period
- 11 Months
Description
3bhk Semi Furnished
Available: Immediate/Ready to move
Age Of Construction: 4 Years
When you contact, don't forget to mention that you found this ad on PropertyWala.com.
Highlights
- Balcony
- RO System
- Modular Kitchen
- Vastu Compliant
- ATM
- Lift
- Visitor Parking
- Power Back-up
- Maintenance Staff
- Water Supply
- Park
- Swimming Pool
- Gym
- Kids Area
- Gated Community
- Biometric Access
- CCTV Surveillance
- Fire Alarm
- Intercom
- Security Guards
- Park Facing
- Near School
- Near Hospital
Location
dhanori, Dhanorie, Pune - 411015 (Maharashtra)
RERA for Pride World City
P52100026529 MANHATTAN Completed
Confirmed with MahaRERA on 16 Sep 2026. Registered as "MANHATTAN".
- Promoter
- PRIDE BUILDERS LLP
- Registered on
- 30 Sep 2020
- Proposed completion
- Oct 2024
- Project type
- Residential / Group Housing
- Planning authority
- Others
- Address as filed
- S NO 129/1, 129/2, 130/1,2A,2B,2C,3, 131/1, 141/2/2, CHARHOLI, Haveli, Pune, 412015
- Land area
- 17,775 sq m (191,338 sq ft)
- Sanctioned built-up area
- 37,227 sq m (400,719 sq ft)
- Buildings
- MANHATTAN A (22 floors); MANHATTAN B (22 floors); MANHATTAN C (22 floors); MANHATTAN D (22 floors); MANHATTAN F (22 floors); MANHATTAN G (22 floors)
- Parking
- Open Space 0, Closed/Covered 732
- Complaints on the portal
- 1
| Building | Unit type | Carpet area | Units |
|---|---|---|---|
| MANHATTAN A | 1RK | 41 sq m (441 sq ft) | 3 |
| MANHATTAN A | 2BHK | 51 sq m (549 sq ft) | 36 |
| MANHATTAN A | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN A | 1BHK | 38 sq m (412 sq ft) | 1 |
| MANHATTAN B | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN B | 1BHK | 38 sq m (412 sq ft) | 1 |
| MANHATTAN B | 2BHK | 51 sq m (549 sq ft) | 36 |
| MANHATTAN B | 1RK | 41 sq m (441 sq ft) | 3 |
| MANHATTAN C | 1RK | 41 sq m (441 sq ft) | 3 |
| MANHATTAN C | 2BHK | 51 sq m (549 sq ft) | 37 |
| MANHATTAN C | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN D | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN D | 2BHK | 51 sq m (549 sq ft) | 37 |
| MANHATTAN D | 1RK | 41 sq m (441 sq ft) | 3 |
| MANHATTAN F | 2BHK | 52 sq m (560 sq ft) | 37 |
| MANHATTAN F | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN F | 1RK | 42 sq m (452 sq ft) | 3 |
| MANHATTAN G | 2BHK | 58 sq m (624 sq ft) | 82 |
| MANHATTAN G | 1RK | 42 sq m (452 sq ft) | 3 |
| MANHATTAN G | 2BHK | 52 sq m (560 sq ft) | 37 |
Construction progress as reported to the portal
MANHATTAN A
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MANHATTAN B
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MANHATTAN C
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MANHATTAN D
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 50%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MANHATTAN F
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
MANHATTAN G
- Excavation: 100%
- Basement (if any): 100%
- Podiums (if any): 0%
- Plinth: 100%
- Stilt Floor: 100%
- Slabs of Super Structure: 100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises: 100%
- Sanitary Fittings within the flats / premises: 100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks: 100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.: 100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.: 100%
Common areas and facilities
- Internal Roads & Footpaths: 0% - APPLICABLE
- Water Supply: 60% - APPLICABLE
- Sewerage (Chamber, Lines, Septic Tank , STP): 80% - APPLICABLE
- Storm Water Drains: 80% - APPLICABLE
- Landscaping & Tree Planting: 0% - APPLICABLE
- Street Lighting: 0% - APPLICABLE
- Community Buildings: 50% - APPLICABLE
- Treatment And Disposal Of Sewage And Sullage Water: 60% - APPLICABLE
- Solid Waste Management And Disposal: 0% - APPLICABLE
- Water conservation /Rain water harvesting: 0% - APPLICABLE
- Fire protection and fire safety requirements: 60% - APPLICABLE
- Electrical meter room, sub-station, receiving station: 60% - APPLICABLE
- Aggregate area of recreational Open Space: 0% - APPLICABLE
- Open Parking: 0% - APPLICABLE
Reviews for Dhanorie
very good location near to DY patil college and near to Pune Airport. suitable for both college students bachelors and family
Pros
- near to school college
Dhanorie is an upcoming residential hub with all the needed infrastructure, for running the life smoothly, available in the proximity. It is located between chakan and Ranjangaon MIDC. Airport is 02 km away. Station is 08-09 km away. Educational institutes are well within reach.
Pros
- well planned
- away from the city traffic chaos
- pleasent morning and evening
Cons
- Has a slight rural touch, because of still under development
Dhanori is 10 km from Pune Railway station and less than 3 km from Vishrantwadi.
Very close to Pune Airport and comes under PMC limits.Pros
- Top class area
- Well connected
Price Trends
Apartments for rent in Dhanorie, Pune
- Property ID
- P194561662
- Listed
- Searches
- 4712
- Views
- 151













